Power Factor Correction for ABO-TRABA Desalination Plant: Case Study

المصدر: المجلة الليبية للأبحاث الهندسية
الناشر: جامعة بنغازي - كلية الهندسة
المؤلف الرئيسي: Rajab, Zakariya (Author)
مؤلفين آخرين: Buamud, Mohammed (Co-Author), Elwalid, Mukhtar (Co-Author)
المجلد/العدد: مج1, ع1
محكمة: نعم
الدولة: ليبيا
التاريخ الميلادي: 2017
الشهر: مارس
الصفحات: 50 - 52
DOI: 10.37376/2402-001-001-009
رقم MD: 1257219
نوع المحتوى: بحوث ومقالات
اللغة: الإنجليزية
قواعد المعلومات: science
مواضيع:
كلمات المؤلف المفتاحية:
Power Factor Correction | Increased System Capacity | Harmonics
رابط المحتوى:
صورة الغلاف QR قانون
حفظ في:
المستخلص: Power factor is a way of measuring the percentage of reactive power in an electrical system. Reactive power represents the wasted energy electricity. Reactive power is used by inductive load (such as, motors, transformers, fluorescent light, arc welders and induction furnaces) to sustain their magnetic fields. Electric systems with many motors exhibit low power factors, increased conductor and transformer losses, and lower voltages. Utilities must supply both active and reactive power to compensate these losses. However, the influence of voltage and current harmonics on equipment connected to electrical system can cause serious problems in power factor correction; it can be improved by adding shunt capacitors. Capacitors act in opposition to inductive loads, there by minimizing there active power required to serve them. Unfortunately, power factor correction capacitors may produce harmonic resonance and magnify utility capacitor-switching transients. Therefore, it is often desirable to implement one or more capacitor banks in a facility as a harmonic filter [1]. The main objective of this paper is to raise the power factor for ABO TRABA desalination plant to the economic and optimum value. The scope of the paper includes studying the phenomena's that can cause significant damage and distortion to a given power system such as harmonics and resonance. The study includes billing data monthly collected, which is a plant survey. From the study, some calculations have been done such as power factor penalty savings, Loss savings, payback period, losses reductions and increase system capacity.