Construction Stage Analysis of Cable - Stayed Bridges: Tuti Bahari Bridge

المصدر: المجلة العربية للنشر العلمي
الناشر: مركز البحث وتطوير الموارد البشرية - رماح
المؤلف الرئيسي: Amin, Tahani M. (Author)
مؤلفين آخرين: Mohamed, Abdelrahman Elzubair (Co-Author)
المجلد/العدد: ع29
محكمة: نعم
الدولة: الأردن
التاريخ الميلادي: 2021
الشهر: آذار
الصفحات: 40 - 56
ISSN: 2663-5798
رقم MD: 1435458
نوع المحتوى: بحوث ومقالات
اللغة: الإنجليزية
قواعد المعلومات: EduSearch, HumanIndex
مواضيع:
كلمات المؤلف المفتاحية:
Erection Procedure | Backward Construction | Construction Stage | Pre-Tension
رابط المحتوى:
صورة الغلاف QR قانون
حفظ في:
LEADER 04217nam a22002417a 4500
001 2182393
041 |a eng 
044 |b الأردن 
100 |9 759425  |a Amin, Tahani M.  |e Author 
245 |a Construction Stage Analysis of Cable - Stayed Bridges:  |b Tuti Bahari Bridge 
260 |b مركز البحث وتطوير الموارد البشرية - رماح  |c 2021  |g آذار 
300 |a 40 - 56 
336 |a بحوث ومقالات  |b Article 
520 |a نجد بان هنالك العديد من التقنيات والطرق المستخدمة في تشييد الجسور المدعمة بالكوابل. وتوثر طرق التشييد هذه على الإجهادات التي يتعرض لها المنشأ أثناء فترة التشييد وكذلك في المرحلة النهائية للتشييد. في هذه الدراسة تم تحليل الجسر المدعم بالكوابل توتي-بحري الذي يربط بين منطقة الخرطوم بحري وجزيرة توتي (تحت الدراسة) لمراحل التشييد المختلفة للجسر باستخدام برنامج الحاسب الآلي Midas civil معتمدا في التحليل بطريقة backward analysis، وحيث أن البرنامج يتميز بالطريقة المثلي في إيجاد معامل الحمل لحساب قوة الشد المطلوبة في الكوابل التي تمثل عاملا مهما في عملية التشييد. نجد بأن الهدف من مراحل التشييد هو التعرف على الإجهادات والتشوهات للعارضة الخرسانية والأبراج المكونة للجسر وأيضا إجهادات الشد للكوابل. ونسبة لحدوث انحراف كبير للجسر أثناء التشييد فانه من الضروري عمل تحليل للجسر في هذه المراحل من التشييد. تم مقارنة النتائج المتحصل عليها من التحليل مع المدونة الأمريكية AASHTO 2010 وكانت في الحدود المسموح بها.  |b The erection procedure of the cable-stayed bridge depends on its structural system. Methods of erecting of cable-stayed bridges are as varied and numerous as the ingenuity and number of ere 10ctor contractors. The erection method not only affects the stresses in the structure during erection but may also have an effect on the final stresses of the complete structure. This paper deals with the analysis of cable-stayed bridges at different erection stages during construction, The backward construction process analysis is investigated. The stage by stage construction of TUTI BAHARI cable stayed bridge is performed using MIDAS Civil software. The required pre-tension forces in cable-stays and the corresponding structural configurations of the bridge at different erection stages have been examined and compared in details. The objective of the construction stage analysis simulation is to identify stresses and deformations of the concrete girder and towers, as well as the cable tension stress, to meet the design requirements. Because large deflections occur in the bridge during cantilever construction, it’s necessary to perform construction stage analysis for the cable stayed bridge. The results obtained during the backward construction stage analysis are compared with the AASHTO 2010 requirements. 
653 |a برامج الحاسب الآلي  |a إدارة التشييد  |a تشييد الجسور  |a العارضة الخرسانية  |a السودان 
692 |b Erection Procedure  |b Backward Construction  |b Construction Stage  |b Pre-Tension 
700 |9 759426  |a Mohamed, Abdelrahman Elzubair  |e Co-Author 
773 |4 العلوم الإنسانية ، متعددة التخصصات  |4 العلوم الاجتماعية ، متعددة التخصصات  |6 Humanities, Multidisciplinary  |6 Social Sciences, Interdisciplinary  |c 004  |e Arab journal for scientific publishing  |f al-Mağallaẗ al-ʿarabiyyaẗ li-l-našr al-ilmī  |l 029  |m ع29  |o 2502  |s المجلة العربية للنشر العلمي  |v 000  |x 2663-5798 
856 |u 2502-000-029-004.pdf 
930 |d y  |p y  |q n 
995 |a EduSearch 
995 |a HumanIndex 
999 |c 1435458  |d 1435458 

عناصر مشابهة