ارسل ملاحظاتك

ارسل ملاحظاتك لنا







Evaluation for Slope Failure at Kufranjeh Dam and Management Study to Repair and Improve the Failure Area

المؤلف الرئيسي: Al Rawi, Hala Mohammed (Author)
مؤلفين آخرين: Al Rawi, Orabi (Advisor)
التاريخ الميلادي: 2015
موقع: عمان
الصفحات: 1 - 114
رقم MD: 901185
نوع المحتوى: رسائل جامعية
اللغة: الإنجليزية
الدرجة العلمية: رسالة ماجستير
الجامعة: جامعة الاسراء الخاصة
الكلية: كلية الهندسة
الدولة: الاردن
قواعد المعلومات: Dissertations
مواضيع:
رابط المحتوى:
صورة الغلاف QR قانون

عدد مرات التحميل

14

حفظ في:
LEADER 03146nam a22003257a 4500
001 1487574
041 |a eng 
100 |9 482612  |a Al Rawi, Hala Mohammed  |e Author 
245 |a Evaluation for Slope Failure at Kufranjeh Dam and Management Study to Repair and Improve the Failure Area 
260 |a عمان  |c 2015 
300 |a 1 - 114 
336 |a رسائل جامعية 
502 |b رسالة ماجستير  |c جامعة الاسراء الخاصة  |f كلية الهندسة  |g الاردن  |o 0019 
520 |a In this research, a geotechnical and management investigations were conducted to evaluate and repair a slope failure occurred along the right side of the spillway related to Kufranjeh Dam located at Wadi Kufranjeh–Jordan. The geotechnical investigation included engineering evaluations for the geological formations and structures existing at Kufranjeh Dam region, in addition to the evaluations for the existing slope failure area. Furthermore, the first phase of investigation included suggesting several proposed alternatives (solutions) to be performed in order to repair the failure zone and improve the performance for the current geological formations. Out of these suggestions, three alternatives were selected as the most appropriate and applicable for the study area; however, these selections are gabion wall, reinforced concrete counterfort wall, and reinforced earth retaining wall. Detailed design and shop drawings (for each of these selected alternatives) was implemented and presented for the purpose of entering into the second phase of investigation regarding this research. The second phase of investigation was concerning the management part of this research, in which the most suitable and applicable alternative was chosen depending on engineering comparisons between alternatives that considered the same engineering performance for them, the final cost of executing each project, the total construction duration for each, in addition to the develop work plan for the project. However, the findings for this research showed that the reinforced earth retaining wall is the most suitable and applicable alternative compared with other proposed alternatives. 
653 |a التكوينات الجيولوجية  |a التقييم الهندسي  |a الأردن، كفرنجة  |a الأراضي المنحدة  |a سد كفرنجة  |a استصلاح الأراضي 
700 |9 482589  |a Al Rawi, Orabi  |e Advisor 
856 |u 9802-021-004-0019-T.pdf  |y صفحة العنوان 
856 |u 9802-021-004-0019-A.pdf  |y المستخلص 
856 |u 9802-021-004-0019-C.pdf  |y قائمة المحتويات 
856 |u 9802-021-004-0019-F.pdf  |y 24 صفحة الأولى 
856 |u 9802-021-004-0019-1.pdf  |y 1 الفصل 
856 |u 9802-021-004-0019-2.pdf  |y 2 الفصل 
856 |u 9802-021-004-0019-3.pdf  |y 3 الفصل 
856 |u 9802-021-004-0019-4.pdf  |y 4 الفصل 
856 |u 9802-021-004-0019-5.pdf  |y 5 الفصل 
856 |u 9802-021-004-0019-O.pdf  |y الخاتمة 
856 |u 9802-021-004-0019-R.pdf  |y المصادر والمراجع 
930 |d y 
995 |a Dissertations 
999 |c 901185  |d 901185 

عناصر مشابهة