ارسل ملاحظاتك

ارسل ملاحظاتك لنا







The Implementation of Budgeting in the ICT Environment: A Case Study of Competing Logics

المصدر: مجلة كلية التجارة للبحوث العلمية
الناشر: جامعة الإسكندرية - كلية التجارة
المؤلف الرئيسي: Kholeif, Ahmed Othman Rashwan (Author)
المجلد/العدد: مج53, ع2
محكمة: نعم
الدولة: مصر
التاريخ الميلادي: 2016
الشهر: يوليو
الصفحات: 1 - 29
DOI: 10.21608/ACJ.2016.62557
ISSN: 1110-7588
رقم MD: 992889
نوع المحتوى: بحوث ومقالات
اللغة: الإنجليزية
قواعد المعلومات: EcoLink
مواضيع:
كلمات المؤلف المفتاحية:
ERP | Accountability | Transparency | Performance Based Budgeting | Logics of Critical Explanation
رابط المحتوى:
صورة الغلاف QR قانون
حفظ في:
LEADER 03047nam a22002297a 4500
001 1735662
024 |3 10.21608/ACJ.2016.62557 
041 |a eng 
044 |b مصر 
100 |9 362841  |a Kholeif, Ahmed Othman Rashwan  |e Author 
245 |a The Implementation of Budgeting in the ICT Environment:  |b A Case Study of Competing Logics 
260 |b جامعة الإسكندرية - كلية التجارة  |c 2016  |g يوليو 
300 |a 1 - 29 
336 |a بحوث ومقالات  |b Article 
520 |b The purpose of this paper is to ex-amine the multiple competing logics at work in an attempt by the European Un-ion (EU) to institutionalize performance-based budgeting (PBB) as part of an Industrial Modernization Programme (IMP) in Egypt. An Enterprise Resource Planning (ERP) as one of to-day‘s modern information and communication technologies (ICT) was introduced to facilitate the management of PBB in the Industrial Modernization Centre (IMC), the executive arm of the IMP. A recent theoretical framework that analyzes discourses in term of social, political and fantasmatic logics was used. Case study materials were collected from interviews, site visits and observations and documentary evidence. The findings of this study revealed the failure to institutionalize PBB fantasy imposed by the EU as a condition of funding and the ERP that sup-posedly supports the diffusion of PBB led to its failure. The competing political logics at all levels (the EU, the Egyptian government and the IMC) rendered the PBB fantasy impossible. The social logics of PBB are very different from the social logics of line item budgeting. This study is based on studying the introduction of performance-based budgeting and the role of ERP in its implementation in an Egyptian enterprise, the IMC. The debate needs to continue on the desirability and means of instilling accountability cultures in different countries. This study contributes to debate on the role of supra-national organizations like the EU and the World Bank in the globalization of performance-based budgeting. It also introduces a new theoretical frame-wo-rk, Logics of Critical Explanation, as a useful tool in understanding change and stability of management accounting systems. 
653 |a تخطیط موارد المؤسسات  |a المساءلة  |a الشفافیة  |a الموازنة القائمة على الأداء  |a منطق التفسیر النقدی  |a الموازنة  |a تکنولوجیا المعلومات والاتصالات 
692 |b ERP  |b Accountability  |b Transparency  |b Performance Based Budgeting  |b Logics of Critical Explanation 
773 |4 إدارة الأعمال  |6 Business  |c 009  |e Journal of the Faculty of Commerce for Scientific Research  |f Maǧallaẗ Kulliyyaẗ Al-Tiǧāraẗ li-l-Buḥūṯ Al-ʿilmiyyaẗ  |l 002  |m مج53, ع2  |o 1049  |s مجلة كلية التجارة للبحوث العلمية  |v 053  |x 1110-7588 
856 |u 1049-053-002-009.pdf  |n https://acjalexu.journals.ekb.eg/article_62557.html 
930 |d n  |p y 
995 |a EcoLink 
999 |c 992889  |d 992889 

عناصر مشابهة