LEADER |
05434nam a22002297a 4500 |
001 |
2204505 |
041 |
|
|
|a ara
|
044 |
|
|
|b مصر
|
100 |
|
|
|a محمد، أمجاد محمد محمد الكومي
|q Alkoumi, Amjad Mohammed
|e مؤلف
|9 161682
|
245 |
|
|
|a مدخل مقترح للتكامل بين نظامي تكاليف النشاط من منظور الأداء لأغراض تطوير أداء "ERP" وتخطيط موارد المنشأة "PF-ABC" الأنشطة:
|b دراسة ميدانية
|
246 |
|
|
|a A Proposed Approach for Integration the Performance Focused- Activity Based Costing System "PF-ABC" and the Enterprise Resources Planning System "ERP" for Improving Activities Performance:
|b A Field Study
|
260 |
|
|
|b جامعة عين شمس - كلية التجارة - قسم المحاسبة والمراجعة
|c 2024
|g أبريل
|
300 |
|
|
|a 157 - 210
|
336 |
|
|
|a بحوث ومقالات
|b Article
|
520 |
|
|
|a يستهدف هذا البحث اختبار مدي تأثير التكامل بين نظام تكاليف النشاط من منظور الأداء (Performance Focused- Activity Based Costing System (PF-ABC) ونظام تخطيط موارد المنشأة Enterprise Resources Planning System (ERP) علي تحسين وتطوير أداء أنشطة المنشأة من المنظور التشغيلي. وقد اعتمد هذا البحث على المنهج الاستقرائي في بناء الإطار المفاهيمي لموضوع البحث، كما اعتمد على المنهج الاستنباطي في التعرف على مدي أهمية إدراج تطبيقات نظام موارد المنشأة ضمن إطار استخدام نظام تكاليف النشاط من منظور الأداء ((PF-ABC في الواقع التطبيقي، وذلك من خلال تصميم استمارة الاستقصاء الموزعة على الشركات التابعة للهيئة العامة المصرية للبترول (EGPC) والتي تلتزم بتطبيق نظام تخطيط موارد المنشأة (ERP). وقد أظهرت نتائج الدراسة الميدانية أن استخدام تطبيقات تكنولوجيا المعلومات المتكاملة (والمتمثلة في برامج نظام تخطيط موارد المنشأة) يؤدى إلى بناء قاعدة للبيانات والمعلومات المتكاملة والموحدة فيما بين الأنشطة والوظائف (داخليا- خارجيا)، مما ساعد على تحقيق الاستفادة الكاملة من هدفي نظام تكاليف النشاط من منظور الأداء (PF-ABC) وهما: القياس الدقيق لتكاليف الأنشطة، وفي نفس الوقت رقابة وتقييم الأداء من خلال تحسين مؤشري الكفاءة والفعالية لهذه الأنشطة.
|b This research aims to test the degree of impact of integrating the Performance Focused-Activity Based Costing System (PF-ABC) and the application of Enterprise Resources Planning System (ERP) on improving and developing the performance of the enterprise 's activities from an operational perspective. This research relied on the inductive approach in developing the conceptual framework for the research topic. It also relied on the deductive approach in measuring the degree of prominence of integrating both systems (i.e., PF-ABC and ERP) in the practical field, through designing a survey form. The survey was shared with companies affiliated with the Egyptian General Petroleum Corporation (EGPC) and which are committed to implementing (ERP). The results of the field study showed that the use of integrated information technology applications (represented in the Enterprise Resource Planning System) leads to building an integrated and unified data and information base among various activities and functions (internally-externally) within the company. This in turn helps to achieve the maximum benefit and fulfill the objectives of (PF-ABC) System, which are to accurately measure the costs of the activities, and at the same time to monitor and develop performance through improving the efficiency and effectiveness indicators of these activities.
|
653 |
|
|
|a محاسبة التكاليف
|a أنظمة التكاليف
|a الأداء التشغيلي
|a الشركات المصرية
|
692 |
|
|
|a نظام التكاليف على أساس النشاط
|a نظام التكاليف على أساس زمن النشاط
|a نظام تكاليف النشاط من منظور الأداء
|a نظام تخطيط موارد المنشأة
|a تقييم الأداء
|a الموارد المرنة
|a الموارد الإلزامية (أو الملزمة)
|a إنتاجية النشاط
|a انحراف الكفاءة
|a انحراف الفعالية
|b Activity Based Costing System (ABC)
|b Time Driven-Activity Based Costing System (TD-ABC)
|b Performance Focused-Activity Based Costing System (PF-ABC)
|b Enterprise Resources Planning System (ERP)
|b Performance Evaluation
|b Flexible Resources
|b Committed (Or Promised) Resources
|b Productivity of Activity
|b Efficiency Variance
|b Effectiveness Variance
|
773 |
|
|
|4 الاقتصاد
|4 إدارة الأعمال
|6 Economics
|6 Business
|c 032
|f Al-Fikr Al-Muhasabī
|l 001
|m مج28, ع1
|o 0541
|s الفكر المحاسبي
|t Accounting Thought
|v 028
|x 2356-8402
|
856 |
|
|
|u 0541-028-001-032.pdf
|
930 |
|
|
|d y
|p y
|q n
|
995 |
|
|
|a EcoLink
|
999 |
|
|
|c 1459327
|d 1459327
|